Commencement Completion Project Name Scope of the Project
2016 ONGOING T2240 STAR RAFINERY PROJECT/ ALİAĞA, TURKEY
PIPE INSTALLATION WORKS
Within the scope of this project; between 2" - 32" dia. 6.194 ton (274.000 WDI), <2" dia. 218 ton (81.000 WDI) pipe installation and in total 515 ton pipe support installation was completed.
2013 2014 TÜPRAŞ RUP PROJECT/ KOCAELİ, TURKEY
PIPE SPOOL FABRICATION
Within the scope of this project, 114,000 WDI carbon steel pipe spools were fabricated.
2012 2013 SOUTH YOLOTEN GAS FIELD DEVELOPMENT PROJECT-PACKAGE 2/ TURKMENISTAN
PIPE INSTALLATION
Within the scope of this project, 150.000 WDI process piping installation was completed.
2011 2011 LUHAIS & SUBBA OIL FIELD/ IRAQ
MANİFOLD FABRICATION
Within the scope of this project, 100 ton of manifolds were fabricated to be used at Luhais and Sabba Oil Field.
2010 2012 ASAB MAIN OIL LINE/ ABU DHABI, UAE
PIPE INSTALLATION
Within the scope of this project, 10.000 ton steel erection and 151.000 WDI pipe installation were completed.
2008 2008 KHURAIS WATER INJECTION PLANT/ SAUDI ARABIA
PIPE SPOOL FABRICATION
Within the scope of this project, total of 70,000 WDI pipe spools were fabricated.
2006 2008 KASHAGAN POWER PLANT/ KAZAKHSTAN
PIPE SPOOL FABRICATION
Within the scope of this project, total of 270,000 WDI pipe spools were fabricated.