PIPELINE PROJECTS 

Commencement Completion Project Name Scope of the Project
2017 2018

TANAP TRANS ANATOLIAN NATURAL GAS PIPELINE PROJECT– COMPRESSOR AND METERING STATIONS/

TURKEY
PIPING, MECHANICAL EQUIPMENT ERECTION AND TANK ERECTION WORKS

Within the scope of this project; 

  • CS5 Main, CS5 Offtake & MS2 stations pipe installation (77.259 ID + 11.221 ID = 88.480 ID)
  • 101 ton pipe support fabrication and installation, mechanical equipment installation (2.171 ton), storage tanks installation (3 pcs. with total weight of 72 ton)
  • CS1 station storage tanks installation (3 pieces with total weight of 72 ton), MS4 station storage tanks installation (2 pieces with total weight of 66 ton) were completed.
2017 ONGOING

TANAP TRANS ANATOLIAN NATURAL GAS PIPELINE PROJECT–  LOT 3/

TURKEY
BLOCK VALVE STATIONS AND PIG STATION MECHANICAL WORKS

Within the scope of this project,

  • 7 valve stations (BVS 26 - BVS 32) and 1 pig station (PS 5) comprising of 745 ton mechanical installation and 15.096 WDI piping, 616 ton equipment installation, pipe support and installation (total weight of 50 ton) were completed.