2017 |
2018 |
TANAP TRANS ANATOLIAN NATURAL GAS PIPELINE PROJECT– COMPRESSOR AND METERING STATIONS/
TURKEY
PIPING, MECHANICAL EQUIPMENT ERECTION AND TANK ERECTION WORKS
|
Within the scope of this project;
- CS5 Main, CS5 Offtake & MS2 stations pipe installation (77.259 ID + 11.221 ID = 88.480 ID)
- 101 ton pipe support fabrication and installation, mechanical equipment installation (2.171 ton), storage tanks installation (3 pcs. with total weight of 72 ton)
- CS1 station storage tanks installation (3 pieces with total weight of 72 ton), MS4 station storage tanks installation (2 pieces with total weight of 66 ton) were completed.
|
2017 |
ONGOING |
TANAP TRANS ANATOLIAN NATURAL GAS PIPELINE PROJECT– LOT 3/
TURKEY
BLOCK VALVE STATIONS AND PIG STATION MECHANICAL WORKS
|
Within the scope of this project,
- 7 valve stations (BVS 26 - BVS 32) and 1 pig station (PS 5) comprising of 745 ton mechanical installation and 15.096 WDI piping, 616 ton equipment installation, pipe support and installation (total weight of 50 ton) were completed.
|