DETERGENT PLANT PROJECTS

Commencement Completion Project Name Scope of the Project
2010 2010 TESSA PROJECT DETERGENT PLANT/ KOCAELİ, TURKEY
NEW AIR HEATER SYSTEM FABRICATION, CONSTRUCTION, ELECTRICAL WORKS AND MECHANICAL INSTALLATION
Within the scope of this project; fabrication, construction, electrical works and mechanical installation were completed. 
2008 2008 TESSA PROJECT DETERGENT PLANT/ KOCAELİ, TURKEY
BULK FLOW HEAT EXCHANGER CAPACITY INCREASE MECHANICAL FABRICATION INSTALLATION WORKS
Within the scope of this project; total of 12 ton of various fabrication, erection and insulation works were completed. 
2003 2004 TESSA PROJECT DETERGENT PLANT/ KOCAELİ, TURKEY
EQUIPMENT FABRICATION, PROCESS PIPING, MECHANICAL AND INSTRUMENTAL INSTALLATION

Within the scope of this project;

  • Equipment installation, process piping, mechanical and instrumental installation, isolation and painting were completed. 
  • Equipment Fabrication- Vessels: 8 carbon steel and 68 stainless steel vessels were fabricated.
  • Equipment fabrication - Silos: 4 carbon steel and 9 stainless steel silos were fabricated.
  • Equipment fabrication - Storage Tanks: 9 carbon steel and 5 stainless steel storage tanks were fabricated
  • Special Process Equipment Fabrication: 2 carbon steel tanks with agitator  ( 4m3 and 5m3), 40 m3 gravity seperator and 2 Stainless tanks with agitator (8m3 and 13m3) were fabricated. 
  • Mechanical and Instrumental Installation: Erection and installation of pre-fabricated equipment and ready items (pump, fan and motor etc.) were completed on site. Instrument installation consists of approximately 300 pieces. All ready items were supplied by the client. 
  • Process Piping: Within the scope of process piping; fabrication, heat tracing and insulation works were completed. 1325 m carbon steel pipe and 2480 m stainless steel pipe were fabricated and installed on site.  420 m of stainless steel pipes were jacketed pipes. Jacketed pipes were fabricate dand installed on site. 
  • Insulation: Steel storage tanks, piping and equipment were insulated. Total of 2480 m pipe and 1110 m2 equipment insulation were completed.