PIPING PROJECTS 

Commencement Completion Project Name Scope of the Project
2017 ONGOING

T2240 STAR RAFINERY PROJECT/

ALİAĞA, TURKEY
PIPE INSTALLATION WORKS

Within the scope of this project; between 2" - 32" dia. 6.194 ton (274.000 WDI), <2" dia. 218 ton (81.000 WDI) pipe installation and in total 515 ton pipe support installation was completed. 
2015 2015

PROPYLENE OXIDE (PO) PROCESS UNIT/

SAUDI ARABIA
ABOVE GROUND PIPE INSTALLATION WORKS

Within the scope of this project; 95.071 m pipe installation, 101.573 WDI welding and pipe support installation works were completed. 
2012 2013

SOUTH YOLOTEN GAS FIELD DEVELOPMENT PROJECT-PACKAGE 2/

TURKMENISTAN
PIPE INSTALLATION

Within the scope of this project, 150.000 WDI process piping installation was completed.
2010 2012

ASAB MAIN OIL LINE/

ABU DHABI, UAE
PIPE INSTALLATION

Within the scope of this project, 10.000 ton steel erection and 151.000 WDI pipe installation were completed.